STUDIO 1
E
Eduard Ignatjev, Founder of STUDIO 1
, 8 min read

Website launch checklist: what to check before going live

Most launch problems are not dramatic. The site goes live, everyone celebrates, and two weeks later someone notices that the contact form has been sending enquiries to a developer's test address. A launch checklist exists to catch exactly these quiet failures. This one is written for business owners and covers what to verify before the switch, on launch day and during the first week.

Share:

Forms, email and payments

A form that fails silently costs real money, because nobody knows the enquiries are missing.

  • Submit every form on the site and confirm the message arrives in the right inbox, not in spam. Test from a phone as well.
  • Check the sender address and the domain's email settings. SPF, DKIM and DMARC records should be in place so that notifications and auto replies are delivered.
  • Verify what the visitor sees after submitting: a clear confirmation, and ideally a copy by email.
  • Confirm that spam protection is active and does not block real submissions.
  • For a store, place a real order with each payment method and each delivery method, then refund it. Check the order emails, the invoice, VAT and stock changes.
  • Switch payment gateways from test mode to live mode and make sure the live keys are in place.

If forms feed a CRM or a booking system, follow one test enquiry all the way through to the place where your team will actually see it.

SEO and redirects

If the new site replaces an old one, this section decides whether you keep your search traffic.

  • Export a list of all old URLs from the old sitemap, Search Console and analytics. Every old address must either still exist or redirect with a 301 to the closest matching new page, not all of them to the homepage.
  • Remove the noindex setting and any robots.txt block used during development. This is the single most damaging thing to forget.
  • Check that each page has a unique title and meta description, one H1 and a canonical tag pointing to its own live address.
  • Make sure the XML sitemap lists the live domain and only pages that should be indexed.
  • On multilingual sites, confirm that hreflang tags reference the final URLs.
  • Check that the site answers on one address only: https with or without www, with the other variants redirecting to it.

Keep the redirect map in a spreadsheet. You will need it again when someone reports a broken link three months later.

Analytics, launch day and the first week

Measurement must work from the first day, otherwise you cannot compare the new site with the old one.

  • Install analytics with consent mode, exclude your own office traffic and define conversions: form submissions, phone clicks, orders.
  • Verify the domain in Google Search Console and submit the sitemap.
  • Lower the DNS record TTL a day or two before the switch so the change spreads quickly.
  • Launch early in the week and early in the day, never on a Friday afternoon. You want the people who built the site available if something breaks.
  • Keep the old site and its database as an archive for at least a few months.

During the first week, look at Search Console daily for crawl errors and 404 pages, and add redirects for any address you missed. Compare form submissions and orders with your usual volume. A sudden drop to zero usually means a technical fault, not a lack of interest.

After a month, compare traffic, enquiries and rankings with the period before launch. A small dip in the first weeks after a redesign is normal; a steady decline is a sign that redirects or indexing need attention.

FAQ

How long before launch should we start testing?

For a typical business website, plan at least one full week between the moment the site is considered finished and the launch date, and two weeks for an online store or a site with integrations. The first days go to content review and functional testing: forms, payments, languages and mobile layouts. Then the developers need time to fix what was found, and the fixes need a second check. The most common mistake is treating the deadline for finishing the build as the launch date, which leaves no time for testing at all. Agree in advance on a content freeze, a named person on your side who signs off each section, and a short list of launch blockers. Minor issues that do not affect visitors or search can be scheduled for the week after launch.

Will my site lose rankings after a relaunch?

Some fluctuation is normal, but a well prepared relaunch should not cause a lasting loss. When URLs, content and structure change, Google needs time to recrawl the site and reassess the pages, and during those two to six weeks positions can move up and down. Lasting drops almost always have a specific cause: old addresses without 301 redirects, a noindex tag left from development, pages or texts that ranked well being removed, titles rewritten without regard to the queries they served, or a much slower new site. You reduce the risk by keeping URLs unchanged wherever possible, redirecting every changed address individually, carrying over the content of your best performing pages and watching Search Console closely in the first weeks so that errors are caught within days rather than months.

Who is responsible for the checklist: us or the agency?

Both, for different parts, and it is worth agreeing on the split in writing before the project starts. The agency or developer is normally responsible for the technical side: redirects, indexing settings, speed, security, backups, forms delivering correctly and analytics being installed. The client is responsible for what only the business can verify: that the texts, prices and company details are correct, that enquiries reach the right people, that legal pages reflect how the company really operates and that payment and delivery settings match actual terms. Problems appear in the grey areas, such as who writes the redirect list or who sets up email authentication. Ask the agency for its own launch checklist, compare it with this one and assign a name to every open item.

Share:

Related articles

Blog

Let's talk about your project

Send a short brief, we'll get back within one business day with a free quote.